Short answer: a low bid that leaves things out isn’t a lower price. It’s the same price, billed to you later as change orders. We’ve watched it happen to Jacksonville homeowners for years, and the pattern doesn’t change.
Here’s how it works, and how to tell the difference before you sign.
The Trick Behind the Low Number
Every time we don’t get hired, it’s not because we’re high priced. It’s because another contractor got the customer to sign a lower contract, knowing they were going to change-order them for thousands and thousands of dollars afterward.
On the rare occasions we get feedback afterward, most of the time the job came in at the exact same price as our estimate, if not more. Everybody thinks they’re getting a deal, and it ends up biting them.
Our philosophy is the opposite: we put everything we possibly can into the estimate. I’d rather have you see the worst case up front and plan for it than sign you low and surprise you later. To me, signing somebody to a contract you already know will run thousands more is deceiving them.
What a Change Order Should Be, and What It Shouldn’t
A change order is legitimate in exactly two situations:
- You want something better. You upgrade a material, add scope, change your mind. That’s your call and it costs what it costs.
- Something unforeseen turns up. Behind walls, above ceilings, places nobody could inspect before demo. Nobody can price what nobody can see.
Here’s the line most contractors won’t draw: if the estimator should have caught it, if a measurement was wrong, that is not on the homeowner. That was our mistake and we take that responsibility. You don’t pay for our math.
If a contractor’s change orders don’t fit those two categories, you’re not looking at surprises. You’re looking at the rest of the real price.
The Bathroom That Got Done Twice
A while back a lady called us about her master bathroom. We had estimated it about a year earlier, and another contractor beat our price. She went with them.
She spent the next year going through hell with that job. When she called us back, we ended up doing the entire bathroom, and we had to tear out everything they did first. By the end it cost her probably five to six thousand dollars more than it should have, and she paid for the same bathroom twice.
That’s not a rare story for us.
How to Compare Bids So This Doesn’t Happen to You
- Ask what’s excluded, not just what’s included. The gap between two bids usually lives in what the cheaper one left out.
- Ask each contractor to define their change-order policy in writing. Who pays when the estimator gets it wrong? If the answer isn’t “we do,” keep looking.
- Treat a big price gap as information. If one bid is thousands under the others, someone is either missing scope or planning to find it later.
- Ask for worst-case, not best-case. A contractor willing to show you the ugly number up front is telling you they don’t need change orders to get paid.
We’ve also put together questions to ask potential contractors before you sign anything.
FAQs
Why is one contractor’s bid so much lower than the others?
Usually because it doesn’t include the same scope. Some contractors intentionally bid low to win the signature, knowing that unpriced work will come back as change orders. Compare what’s excluded, not just the bottom-line number.
Are change orders always a bad sign?
No. Upgrades you ask for and genuinely unforeseen conditions behind walls or ceilings are legitimate change orders. The bad sign is change orders for things a competent estimator should have priced from the start.
Who pays when the contractor’s estimate was wrong?
In our view, the contractor. If our estimator should have caught something or a measurement was wrong, that was our mistake and we take that responsibility. Ask any contractor you’re considering how they handle this before you sign.
Is it worth getting a second bid even if I like the first contractor?
Yes, if only to see the range. We regularly hear from homeowners who picked the first contractor without doing their research and ended up in a mess. The comparison itself tells you what a complete bid looks like.
What should a good estimate include?
As much of the real scope as the contractor can possibly put in it, priced at what it actually costs, including the worst case. If an estimate feels light on detail, the detail will show up later on invoices instead.
Getting a Real Number for Your Project
If you want an estimate that includes everything we can possibly put in it, we’ll give you one. It might not be the lowest number you collect. Based on what customers who left and came back tell us, it’s usually what the job was going to cost anyway.
We handle home renovation and remodeling across the area, including Clay County and St. Johns County. Start with the estimate.